Pitka's Point/St. Mary's Wind Energy Construction Project. Final report [electronic resource]

 0 Người đánh giá. Xếp hạng trung bình 0

Tác giả:

Ngôn ngữ: eng

Ký hiệu phân loại: 333.9 Other natural resources

Thông tin xuất bản: Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 2020

Mô tả vật lý: Size: 6 p. : , digital, PDF file.

Bộ sưu tập: Metadata

ID: 257934

This is the final report for the St. Mary?s/Pitka?s Point Wind Construction Project. Under the project Alaska Village Electric Cooperative, Inc. (AVEC) constructed and commissioned one new 900 kW-capacity wind turbine at a site in Pitka?s Point about 4 miles from the diesel-fired prime power plant in St. Mary?s. The main objective of this project is to generate electric power from a renewable resource in an effort to reduce the local dependency on fuel oil as the sole source of electric power generation. The wind generator?s output augments the prime source generation provided by the diesel-powered generators.
Tạo bộ sưu tập với mã QR

THƯ VIỆN - TRƯỜNG ĐẠI HỌC CÔNG NGHỆ TP.HCM

ĐT: (028) 71010608 | Email: tt.thuvien@hutech.edu.vn

Copyright @2024 THƯ VIỆN HUTECH