To obtain a permit, to construct, to connect 3x6MW permanent magnet direct drive wind power generators, and to deliver to the ERCOT grid 18MW of renewable energy from up to 5 miles offshore San Pedro Island, Texas. To further develop the site to accommodate up to 1000MW of productivity and thereby drive down the average cost of construction, making offshore wind power economically competitive with alternative sources of energy.