In accordance with the Statement of Project Objectives (SOPO) agreed to between the Department of Energy (?DOE?) and Statoil for the Hywind Maine project, Statoil hereby submits a Budget Period 1 Summary Report which includes accomplishments for the project. The report includes summaries of the other submitted reports (see Section 1.2-2) and progress regarding innovations leading to potential reductions in the Cost of Energy (see Section 3). The Hywind Demo project, the world?s first full-scale 2.3 megawatts (MW) floating wind turbine, installed at a water depth of 200 meter (m), 10 kilometer (km) off the coast of Norway, has proven that the Hywind floating substructure is a suitable platform for conventional multi- MW turbines. A principal goal of the Hywind Maine Project was to leverage that experience, both to demonstrate the commercial feasibility of the technology and to further develop and optimize the technology all in order to bring the costs down in a larger scale development. With the Hywind Maine Project, Statoil planned to deploy four turbines of 3 MW in approximately 140 meters water depth. Although the project in Maine will not move forward, much value was gained through the BP1 work package. Advanced modeling related to the design basis, which will have applicability beyond the Maine project, was completed. In addition, initial supply chain analyses were conducted, which will help assist with development of updated cost of energy models. Geophysical and various environmental surveys were also conducted, the results of which Statoil has committed to share publicly, and which will help build a database of information that future developers may be able to access. Finally, Statoil gained a greater understanding of the US offshore wind industry and related markets, which will assist the company as it looks for full-scale, commercial opportunities.