Overcoming challenges to support US resumption of high specific activity cobalt-60 [electronic resource]

 0 Người đánh giá. Xếp hạng trung bình 0

Tác giả:

Ngôn ngữ: eng

Ký hiệu phân loại: 621.48 Nuclear engineering

Thông tin xuất bản: Washington, D.C. : Oak Ridge, Tenn. : United States. Office of the Assistant Secretary for Nuclear Energy ; Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 2020

Mô tả vật lý: Size: Article No. 109494 : , digital, PDF file.

Bộ sưu tập: Metadata

ID: 259920

 Domestic production of high specific activity <
 sup>
 60<
 /sup>
 Co was halted after a target rupture in 2012 at the Advanced Test Reactor (ATR). The Isotope Program (IP) within the US Department of Energy (DOE) Office of Science tasked a multilaboratory team of researchers and managers from Oak Ridge and Idaho National Laboratories with the redesign the radioisotope capsule. The objective of this effort was to create a more robust and reliable design, compared to the pre-2012 target. The team successfully completed this task to produce the DOE-IP cobalt (Co) production capsule design. Furthermore, 66 capsules were successfully fabricated by Oak Ridge National Laboratory (ORNL) and delivered to Idaho National Laboratory (INL) for irradiation in the ATR between January 2014 and October 2016. This paper describes the efforts of the team to prepare and disposition the two initial DOE-IP Co production capsules that were processed in March 2020. These efforts include performing accurate production predictions, experimentally validating predictions with assay measurements, shipping with the Orano-furnished Battelle Energy Alliance Research Reactor shipping package, and disassembling capsules at the isotope vendor site.
Tạo bộ sưu tập với mã QR

THƯ VIỆN - TRƯỜNG ĐẠI HỌC CÔNG NGHỆ TP.HCM

ĐT: (028) 71010608 | Email: tt.thuvien@hutech.edu.vn

Copyright @2024 THƯ VIỆN HUTECH