Transport Cost for Carbon Removal Projects With Biomass and CO2 Storage [electronic resource]

 0 Người đánh giá. Xếp hạng trung bình 0

Tác giả:

Ngôn ngữ: eng

Ký hiệu phân loại: 621.48 Nuclear engineering

Thông tin xuất bản: Washington, D.C. : Oak Ridge, Tenn. : United States. National Nuclear Security Administration ; Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 2021

Mô tả vật lý: Size: Article No. 639943 : , digital, PDF file.

Bộ sưu tập: Metadata

ID: 262521

 Strategies to remove carbon from the atmosphere are needed to meet global climate goals. Promising strategies include the conversion of waste biomass to hydrogen, methane, liquid fuels, or electricity coupled with CO<
 sub>
 2<
 /sub>
  capture and storage (CCS). A key challenge for these projects is the need to connect geographically dispersed biomass supplies with geologic storage sites by either transporting biomass or CO<
 sub>
 2<
 /sub>
 . We assess the cost of transport for biomass conversion projects with CCS using publicly available cost data for trucking, rail, and CO<
 sub>
 2<
 /sub>
  pipelines in the United States. We find that for large projects (order of 1 Mt/yr CO<
 sub>
 2<
 /sub>
  or greater), CO<
 sub>
 2<
 /sub>
  by pipeline is the lowest cost option. However, for projects that send most of the biomass carbon to storage, such as gasification to hydrogen or electricity production, biomass by rail is a competitive option. For smaller projects and lower fractions of carbon sent to storage, such as for pyrolysis to liquid fuels, CO<
 sub>
 2<
 /sub>
  by rail is the lowest cost option. Assessing three plausible example projects in the United States, we estimate that total transport costs range from $24/t-CO<
 sub>
 2<
 /sub>
  stored for a gasification to hydrogen project traversing 670 km to $\$ 36$/t for a gasification to renewable natural gas project traversing 530 km. In general, if developers have flexibility in choosing transport mode and project type, biomass sources and storage sites can be connected across hundreds of kilometers for transport costs in the range of $20-40/t-CO<
 sub>
 2<
 /sub>
  stored. Truck and rail are often viable modes when pipelines cannot be constructed. Distances of 1,000 km or more can be connected in the same cost range when shared CO<
 sub>
 2<
 /sub>
  pipelines are employed.