Electrifying New York City Ride-Hailing fleets [electronic resource] : An examination of the need for public fast charging

 0 Người đánh giá. Xếp hạng trung bình 0

Tác giả:

Ngôn ngữ: eng

Ký hiệu phân loại: 621.48 Nuclear engineering

Thông tin xuất bản: Golden, Colo. : Oak Ridge, Tenn. : National Renewable Energy Laboratory (U.S.) ; Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 2022

Mô tả vật lý: Size: Article No. 104171 : , digital, PDF file.

Bộ sưu tập: Metadata

ID: 265699

 This report assesses the scale of public fast charging needed to electrify approximately 20,000 vehicles across the yellow cab and for-hire segments in New York City. The analysis considers real-world trip data in conjunction with driver home locations, overnight charging access rates, driver schedules, and more. Outcomes indicate that the existing charging network in New York City is not adequate even in the most optimistic scenario
  1,054 150-kW ports are required when 15% of drivers have access to overnight charging, whereas 367 150-kW ports are needed when 100% of drivers have access. Results also indicate that although charging is demanded in areas nearby high trip demand, fast charging ports are also demanded in areas near driver residences as a supplement for home charging in scenarios with limited overnight charging access. These findings motivate investment into both overnight charging and public fast charging to meet the charging demands of ride-hailing fleets.
Tạo bộ sưu tập với mã QR

THƯ VIỆN - TRƯỜNG ĐẠI HỌC CÔNG NGHỆ TP.HCM

ĐT: (028) 71010608 | Email: tt.thuvien@hutech.edu.vn

Copyright @2024 THƯ VIỆN HUTECH