Reconstructing Baseline Data for Impact Evaluation and Results Measurement

 0 Người đánh giá. Xếp hạng trung bình 0

Tác giả: Michael Bamberger

Ngôn ngữ: eng

Ký hiệu phân loại: 526.2 Mathematical geography

Thông tin xuất bản: World Bank, Washington, DC, 2012

Mô tả vật lý:

Bộ sưu tập: Tài liệu truy cập mở

ID: 291557

Many international development agencies and some national governments base future budget planning and policy decisions on a systematic assessment of the projects and programs in which they have already invested. Results are assessed through Mid-Term Reviews (MTRs), Implementation Completion Reports (ICRs), or through more rigorous impact evaluations (IE), all of which require the collection of baseline data before the project or program begins. The baseline is compared with the MTR, ICR, or the posttest IE measurement to estimate changes in the indicators used to measure performance, outcomes, or impacts. However, it is often the case that a baseline study is not conducted, seriously limiting the possibility of producing a rigorous assessment of project outcomes and impacts. This note discusses the reasons why baseline studies are often not conducted, even when they are included in the project design and funds have been approved, and describe strategies that can be used to 'reconstruct' baseline data at a later stage in the project or program cycle.
Tạo bộ sưu tập với mã QR

THƯ VIỆN - TRƯỜNG ĐẠI HỌC CÔNG NGHỆ TP.HCM

ĐT: (028) 36225755 | Email: tt.thuvien@hutech.edu.vn

Copyright @2024 THƯ VIỆN HUTECH