 The main objective of this project (1996-2002), assisted by both the World Bank and the European Investment Bank, with an initial IDA credit of US27.50 million, which rose to US34.21 million equivalent due to exchange rate fluctuation, was to repair and rehabilitate the Selingue Hydropower plant built 26 years ago. Other objectives were: (i) maintain the electricity supply/demand balance by increasing the thermal capacity of the system and implement an energy-efficient program
  (ii) improve the capacity of the Energie du Mali (EDM) to properly operate, maintain and supervise its power generation facilities
  and (iii) prepare a long-term institutional framework and regulatory system for the power sector and privatize EDM.