The research team collected and analyzed data related to punching process, working stations, moving øow, required number of workers and actual operating time at Factory No. 1 of Thang Long Metal Company. On that basis, design and simulate the system with Tecnomatix Plant Simulation software to see the productivity and output of the machines in the system.