Assessment of the impacts of planning traffic bridges system across red river on Ha noi reach to the river bank erosion and river bed changes for period from 2020 to 2030

 0 Người đánh giá. Xếp hạng trung bình 0

Tác giả: Hong Quang Nguyen, Ngoc Đang Nguyen, Thi Ngoc Nhan Nguyen

Ngôn ngữ: eng

Ký hiệu phân loại:

Thông tin xuất bản: Journal Science and Technology Water Resources, 2023

Mô tả vật lý: tr.77

Bộ sưu tập: Metadata

ID: 484104

The article presents some results of research and evaluation about the influence of planning traffic bridges system across Red River on Ha Noi reach to the river bank erosion and river bed changes for period from 2020 to 2030. On the basis of simulation results on hydraulic models, MIKE 21FM HD-ST two-dimensional morphology simulated for the Red River section from Son Tay to Hung Yen and Duong River to Thuong Cat. Bridge piers are simulated in the model using a combination of both meshing and pier simulations. The evaluation results include topographic changes in the cross-section, longitudinal section, changes in the riverbank, and deep creeks on the studied river section before and after the construction of the bridge.
Tạo bộ sưu tập với mã QR

THƯ VIỆN - TRƯỜNG ĐẠI HỌC CÔNG NGHỆ TP.HCM

ĐT: (028) 36225755 | Email: tt.thuvien@hutech.edu.vn

Copyright @2024 THƯ VIỆN HUTECH