As calculating results, to November of 2011, at Ha Rang Coal Enterprise, the reinforced resin bolts have been applied for supporting about 500m at the rock tunnel and up to now the tunnel section supported with these bolts has been stable. However, it is necessary to continuously monitor the replacement and displacement reinforced resin bolts at this site for considering this supporting method as the baisis when applying it to other underground mines.